Business Days Calculator : Count Working Days Excluding Weekends & Holidays
The Business Days Calculator counts net working days between two calendar dates using UTC calendar-date arithmetic so browser time zones and daylight-saving shifts never skew the result. By default it excludes Saturday & Sunday and excludes the end date (so identical dates return 0), while allowing you to switch weekend schedules (Friday & Saturday or Sunday Only), toggle Include end date, or deduct numeric workday holidays capped cleanly at 0. Need total calendar days instead of working days? Use our Days Between Dates Calculator, or project a future deadline with the Add Business Days Calculator.
Interactive Calculator
100% Client-Side EngineStep-by-Step Examples
Q1 2025 Working Days (Both Dates Included & 2 Holidays)
Counting Q1 2025 active business days from January 1 to March 31, 2025 with both dates included, Saturday and Sunday excluded, and 2 user-entered public holidays.
Including both boundary dates spans 90 calendar days. Subtracting 26 Saturday and Sunday weekend days leaves 64 weekdays before deductions, and deducting 2 workday holidays returns 62 business days (or 61 business days if End date excluded stays unchecked).
6-Day Work Week Comparison (Sunday Only Excluded)
Counting Q1 2025 working days from January 1 to March 31, 2025 under a 6-day work week (Sunday Only excluded) with both dates included and 0 holidays.
Under the Sunday Only schedule, Saturdays remain active workdays. Removing only 13 Sundays from 90 calendar days yields 77 working days before holiday deductions.
How Endpoints, Weekend Schedules & Holiday Deductions Change Working Days
Using Q1 2025 (January 1 to March 31, 2025): default settings exclude Saturday & Sunday and exclude the end date. Checking Include end date counts both calendar endpoints (90 calendar days, 26 weekend days, 64 weekdays before deductions), and deducting 2 holidays leaves 62 business days.
| Scenario | Schedule & Endpoints | Calendar / Weekend | Workdays Before Holidays | Net Business Days |
|---|---|---|---|---|
Q1 2025 — Default settings Jan 1 to Mar 31, 2025 | Sat & Sun End date excluded · 0 hol. | 89 cal days 26 wkend days | 63 − 0 deducted | 63 days |
Q1 2025 — Both dates included Counts Jan 1 and Mar 31 | Sat & Sun Both dates included · 0 hol. | 90 cal days 26 wkend days | 64 − 0 deducted | 64 days |
Q1 2025 — Worked example (+2 holidays) Both dates included, 2 holidays | Sat & Sun Both dates included · 2 hol. | 90 cal days 26 wkend days | 64 − 2 deducted | 62 days |
Q1 2025 — Friday & Saturday weekend Middle East schedule | Fri & Sat Both dates included · 0 hol. | 90 cal days 26 wkend days | 64 − 0 deducted | 64 days |
Q1 2025 — Sunday-only weekend 6-day work week | Sunday only Both dates included · 0 hol. | 90 cal days 13 wkend days | 77 − 0 deducted | 77 days |
Q1 2025 — Excessive holidays (100 entered) Deduction capped at workdays | Sat & Sun Both dates included · 100 hol. | 90 cal days 26 wkend days | 64 − 64 deducted (capped) | 0 days |
Same-day Wednesday (June 4, 2025) Both dates included vs. 0 if excluded | Sat & Sun Both dates included · 0 hol. | 1 cal days 0 wkend days | 1 − 0 deducted | 1 day |
Same-day Saturday (June 7, 2025) Both dates included (weekend day) | Sat & Sun Both dates included · 0 hol. | 1 cal days 1 wkend days | 0 − 0 deducted | 0 days |
Because holidays are entered as a single count rather than specific calendar dates, the tool cannot detect whether a holiday falls outside the active span or overlaps a weekend day. Enter only holidays inside your range that fall on scheduled workdays. If the number entered exceeds available workdays, deductions cap cleanly so net business days floor at 0 (never negative).
Entering an earlier End Date (such as 2025-03-31 to 2025-01-01 with both dates included and 2 holidays) swaps dates chronologically and still returns 62 business days. Pure Date.UTC arithmetic prevents local time zones or daylight-saving shifts from skewing the count.
Need a total calendar-day count instead of business working days (without skipping weekends or subtracting holidays)? Use our Days Between Dates Calculator. Need to project a future deadline by adding working days? Try the Add Business Days Calculator.
How to Use This Tool
- Choose a Start Date and End Date. Reversed dates (End Date earlier than Start Date) are ordered chronologically so the tool always returns a non-negative working-day count with a clear notice.
- Select a Weekend Schedule: Saturday & Sunday (default), Friday & Saturday (Middle East), or Sunday Only (6-day work week).
- Enter Public Holidays to Deduct only for holidays inside the counted range that fall on scheduled workdays (numeric entry cannot inspect specific calendar dates or weekend overlaps; excessive counts floor at 0).
- Keep End date excluded (default) or check Include end date to count both boundary dates, then click Calculate. For total calendar days without exclusions, switch to the Days Between Dates Calculator.